If you’re considering adding an accessory dwelling unit (ADU) to your property, you’re probably wondering how long the process will take. While every project is unique, most ADUs take several months from start to finish, depending on design complexity, permitting, and construction.
The good news? With the right team guiding you, your ADU can be completed efficiently, helping you maximize your property’s potential without unnecessary delays. Let’s break down the typical timeline, common roadblocks, and what you can expect during the building process.
The Average ADU Build Timeline
On average, an ADU takes at least 8 to 12 months to complete, and may take more for especially complex floor plans or layouts This timeline includes everything from initial planning and permitting to final inspections and move-in day. The exact duration depends on factors like design choices, site conditions, and local regulations.
Here’s a general breakdown:
- Planning & Permitting: 2 to 4 months
- Site Prep & Foundation: 1 to 2 months
- Construction & Finishing: 4 to 6 months
While some projects move faster, others may take longer if unexpected challenges arise. Understanding what to expect can help you plan accordingly and avoid surprises.
Factors That Can Delay ADU Construction
Even with careful planning, certain factors can slow down your ADU project. Being aware of these potential delays can help you stay proactive and keep your timeline as close to schedule as possible. Here’s a closer look at the most common ADU construction delays in East Atlanta:
1. Permitting and Zoning Challenges
Before construction can begin, your ADU plans must be reviewed and approved by the local permitting office. The time required for approval varies depending on factors like:
- Zoning restrictions – Some properties may not meet the zoning requirements for an ADU, requiring a variance or special approval, which can take weeks or even months.
- Plan revisions – If the city requests modifications to your design for code compliance, it can add time to the approval process.
- Permit backlog – If many homeowners are applying for permits at the same time, the review process may take longer than expected.
To minimize delays, work with a builder who understands East Atlanta’s permitting process and submits accurate, code-compliant plans the first time around.
2. Material Shortages and Supply Chain Issues
Construction materials like lumber, windows, and specialty finishes can experience supply chain delays, especially if they’re custom-ordered or shipped from out of state. Common material-related delays include:
- Backordered items – High-demand materials may take longer to arrive.
- Shipping delays – Unexpected transportation issues can slow delivery.
- Substitution decisions – If an item is unavailable, choosing an alternative can take extra time.
To avoid this, it’s best to select materials early and confirm availability with suppliers before construction begins. Your builder may also suggest locally sourced options that can be delivered faster.
3. Unpredictable Weather Conditions
Atlanta’s climate can be unpredictable, and extreme weather can impact construction at different phases:
- Heavy rain – Delays foundation work, roofing, and exterior finishes.
- Extreme heat – Can slow productivity and impact material performance.
- Cold snaps – May delay concrete pouring and other temperature-sensitive tasks.
While weather delays can’t be prevented, your builder can adjust the schedule to work around seasonal conditions, helping keep your project on track.
4. Site Preparation and Unexpected Conditions
Your property’s existing conditions play a big role in how quickly construction can begin. Unexpected site issues can require additional prep work, including:
- Soil problems – Unstable or rocky soil may need extra grading or reinforcement.
- Tree removal – If large trees are in the way, permits and professional removal services may be required.
- Utility upgrades – If your home’s electrical or plumbing system needs modifications to support the ADU, this can add time to the project.
Conducting a site assessment before breaking ground can help identify and address these challenges early.
5. Custom Design Changes
While customization is one of the best parts of building an ADU, last-minute changes can disrupt the timeline. Some common changes that cause delays include:
- Switching materials – Ordering new finishes, cabinets, or fixtures can extend lead times.
- Layout adjustments – Structural modifications may require design revisions and new permits.
- Upgrading systems – Adding smart home features, solar panels, or other custom upgrades can add installation time.
The best way to avoid delays is to finalize your design choices before construction starts and stick to the plan. If changes are necessary, work with your builder to minimize impact on the timeline.
Understanding The ADU Building Process
Building an ADU isn’t just about construction—it’s a step-by-step journey that involves planning, approvals, and hands-on work. Here’s a quick look at what to expect from our very own team of East Atlanta ADU builders:
Step 1: Initial Consultation
Your journey at SmartSpaces ADUs begins with a no-obligation call with our ADU specialist. To streamline the process, we request your project’s address in order to research zoning regulations and ensure we’re aligned with municipal requirements from the very beginning.
Step 2: On-Site Evaluation
Our ADU specialist and builder will meet you in person to assess your property and discuss your vision. Whether selecting a model, customizing one, or going fully custom, we document key details and outline the scope of work. In this stage, we encourage you to bring any sketches or inspiration to refine your vision.
Step 3: Project Planning & Feasibility Assessment
Now that we have chosen a scope, your SmartSpaces team will provide a rough cost estimate and feasibility study based on your chosen engagement type. If you decide to move forward with us, we manage everything—planning, zoning, design, materials, and a fixed bid. We aim for your ADU build to feel seamless from start to finish.
Step 4: Architectural Design
For base models, we finalize standard plans. For semi-custom ADUs, we adjust layouts to match your residence. For fully custom builds, we will collaborate with an architect to bring your vision to life. We coordinate with surveyors and ensure zoning compliance for all options.
Step 5: Zoning Approval & Permitting
Our team handles the permitting process, working with zoning officials to secure approvals. If modifications are required, we address them quickly to keep your project on schedule.
Step 6: Material Selection & Interior Design
For base models, select from a curated list of finishes. Semi-custom and fully custom projects have more flexibility, allowing personalized selections. Our designer guides you through the process to ensure the final look matches your style and budget.
Step 7: Fixed Bid Presentation
Once permits are approved, we present the final project details and fixed bid. This guarantees pricing clarity before proceeding to construction.
Step 8: Contract Signing & Construction Scheduling
With everything finalized, we sign contracts and confirm a start date. Our team ensures all pre-construction requirements are met.
Step 9: Meet Your Team & Communication Hub
Before construction, you’ll meet your project manager and crew. You’ll also gain access to Co-Construct, our cloud-based management software. This platform provides daily logs, progress updates, and a direct line for questions, change requests, and approvals. Any modifications are instantly communicated to minimize delays.
Step 10: Construction & Completion
Your SmartSpaces ADU build begins. We take every precaution to protect your home—covering floors, sealing doorways, and managing debris removal. We work around your schedule to minimize disruptions. While weather delays are possible, we maintain a structured timeline to stay on track. Upon completion, we secure final approvals, conduct professional cleaning, and deliver a high-quality ADU tailored to your needs.
Start Your SmartSpaces ADU Experience Today
Ready to bring your ADU vision to life? At SmartSpaces ADUs, we specialize in designing and building high-quality ADUs that fit seamlessly into East Atlanta homes. Whether you’re adding a rental unit, guest house, or in-law suite, we make the process stress-free and efficient.
Let’s talk about your project! Contact us today for a consultation, and let’s start building your ADU the right way.